An important infrastructure project that connects the Downtown Cancan and its bomber hotel zone will be opened in December four months later than the Nikupte Auto Bridge, which is a long-length Nikupte vehicle-resistor.
The long -term delayed project is expected to benefit 1.3 million residents The resort city is stored as an important exhaust path during the hurricane season, saving passengers up to 45 minutes.
At a press conference on President Claudia Shinbam on Wednesday morning, the Minister of Infrastructure, Communication and Transport (SICT) Jose Antonio Esteva delivered the update of the project.
Currently, 714 workers and 123 machines are operating at five active work sites, Esteva said. He also confirmed the budget of nearly 2.9 billion Besos ($ 145 million).
“We expect to spend 2.1 billion bezos (US $ 108 million) this year to complete the bridge,” said Esteva.
This will bring the total cost of the bridge to 8.6 billion bessos (US $ 440.5 million). The construction company ICA first made a budget of 5.6 billion bezos ($ 286 million) for the project.
The 14.9 km long project has an 8.8 km three -lane gap, and will benefit 1.3 million residents and millions of tourists visiting the Caribbean Resort.
Most of the bridge will be raised above the Lakuni. It also features a 103 meter metal suspension bridge.
Shinbam visited the place In April, Quintana Ru’s Government Mara Lesama and ICA CEO Quadaloop Philips. At the time, Shinbam said that after the bridge was over, Shinbam said it would operate by November.
Is expected to be completed in late last yearSICT targeted the August swearing -in ceremony Design Changes were required in January. Changes are necessary when many maritime zone permits are denied on the basis of environmentalism.
Additional delays were made by adding a metal curve section to provide additional support, upgrading to storm drainage systems and installing the intelligent transport system more efficiently to manage the flow of traffic to prevent the contamination of lagoon.
Once the Bridge’s direct, high route will facilitate the burden on the current roads on Nechupte Lagoon and drastically reduce the travel time for residents and resort or nearby places.
With reports from The sun’s sunOvarian Sign up for And For this reason!
(Tagstotranslate) Bridge
Story Credit