On Sunday morning (30), MRV Arena held a dynamic download test in the southern sector of the stands, with the aim of ensuring that the support structure, safely, vibrations and intensive movements for ATLETICO-MG fans during games.
The initiative occurred after the chairs were removed in this sector and attended by Galoucura, the main fans in MiningThat was invited to participate in simulation, and reproduce the actual conditions of the match, with distinctive songs and jumps.
According to organized reports on its social networks, the test was successful, and the improvements that were implemented were approved.
How do you work?
The dynamic pregnancy test is a common practice in football fields, and it is necessary to assess the resistance and response of the stands to the vibrations caused by the movement of fans, ensuring the integrity and integrity of the stadium.
Continuous improvements
It opened in 2023, MRV square I have undergone continuous improvements to provide the best experience for the masses. Recently, improvements in the audio stadium have been announced with the installation of the new tiles in covering the southern sector.
The tiles, known as “seamless, semi -perverted tiles”, made of 4 mm steel without holes and have the ability to increase the echo of fans inside the square, without prejudice to the surrounding community.
In addition, in February this year, the installation of compound aluminum boards (ACM) began to cover the southern sector. 3 mm thick, these paintings aim to increase the echo of fans on the field.
Expecting that the installation is in ATLETICO-MG It is completed in May, covering an area of 5400 square meters.