
Rua Padre Visant Maria Da Rocha’s request has begun in public tender, according to the Wagos Chamber of Wakos.
You read an article without payment access. Donate the newspaper to help you keep online News Teveroa free.
A contract, which was budgeted in about 1.450 million euros with a period of 300 days of execution, will be made by a group of corporations judging the Municipality of Walkos – the allegations of the Averoa’s region of the region of Avero – the Adra of Avaro – accepts the accusations that the water and wastewater supply networks, water bodies and restructuring are fulfilled.
The remaining jobs include road infrastructure, external arrangements, signal and rainwater network.
The tasks to be done, reopening the path, maintaining the current meanings of almost existing width and transport, reform existing tours, as much as possible, their width. Significantly from the intervention, the increase in roadside parking spaces, due to existing restructuring and public passenger transport vehicles.
Quoted in a statement, Waos Mayor Jono Palo Ch Ous Cha Sah said that after the Rua Da Fonde was requested, the village’s center would be “with the best conditions for two motorists, residents and other users.”
The road will be intervened across the road from the meeting with the National Road 109 to the Lombomio.
Channel News Teverao on WhatsApp.
Advertising and services
• You can quickly implement advertising campaigns in notíciasdeaveiro.t in the newspaper, as well as other services. Access information to include online ad.
(Tagstotranslate) municipalities
Story Credit